Corrugated lines 3, 5, 7 layers import activities based on the principle of hot steam using heat generated from the boiler, vacuum technology, lots of large diameter wave (Phi 280-425mm) makes lines operate at high speed, stable at speed 80-300m / min, in line with ridges built mill torment, the run out is a complete product carton. Computerized cutting machine cutting precision, deviation <1mm, cut short, sweet and minimize waste.
We are proud to be the supply chain the most waves in 2014 in Vietnam with the number 05 chains nationwide wave installation. At the request of customers, we can design wave line configuration suitable for economic viability as well as the actual requirements of the market.
The basic line wave lines:
Symbols machine |
Design speed |
Production speed |
Large format products |
The number of layers of paper generated waves |
WJ-80 |
80m/minute |
60-70m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ-100 |
100m/minute |
70-80m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ-120 |
120m/minute |
80-100m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ-150 |
150m/minute |
100-130m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ180 |
180m/minute |
150-160m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ200 |
200m/minute |
160-180m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ220 |
220m/minute |
180-200m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ250 |
250m/minute |
200-250m/minute |
1600-2500mm |
2,3,4,5,7 layer |
WJ300 |
300m/minute |
250-280m/minute |
1600-2500mm |
2,3,4,5,7 layer |
Working method
- We advise selection of equipment for customers
- After the customer orders we conduct production during 120 days
- Customers preliminary acceptance in our factories in manufacturing plant prior to the export to Vietnam
- Goods are transported and delivered at the customer's plant
Experienced displacement installation, calibration, training workers, chaythu, acceptance
- Warranty 12 months free components.
- Provide free expert during machine operation.
- Expert warranty experienced during machine operation, experts will be on hand at the plant of the customer within 24 hours to maintain, troubleshoot.
- Provide preferential price components.
- The time from signing the contract until the carton is running: 180 days.
For further information, please contact:
MANUFACTURING COMPANY LIMITED CONSOLIDATED GLOBAL TRADE
Address: Gia Coc - Kieu Ky Commune - Gia Lam - Hanoi
Hotline: 0436.525.425 - 0436.525.350 / Fax: 0436.525.425
Email: toancaupp@gmail.com
Website: giaybaobitoancau.com